热门站点| 世界资料网 | 专利资料网 | 世界资料网论坛
收藏本站| 设为首页| 首页

IEC/PAS 62119 Edition 1.0-1999 产品制造描述数据和传递法实施的总要求

作者:标准资料网 时间:2024-05-10 22:15:01  浏览:8983   来源:标准资料网
下载地址: 点击此处下载
【英文标准名称】:Genericrequirementsforimplementationofproductmanufacturingdescriptiondataandtransfermethodology
【原文标准名称】:产品制造描述数据和传递法实施的总要求
【标准号】:IEC/PAS62119Edition1.0-1999
【标准状态】:现行
【国别】:国际
【发布日期】:1999-11
【实施或试行日期】:
【发布单位】:国际电工委员会(IEC)
【起草单位】:IEC/TC52
【标准类型】:()
【标准水平】:()
【中文主题词】:生产控制;电子设备及元件;印制电路;数据传送;制造;数据处理;计算机辅助制造;生产技术;规范(验收)
【英文主题词】:dataprocessing;datatransfer;cam;productioncontrol;printedcircuits;electronicequipmentandcomponents;productiontechniques;specification(approval);manufacturing
【摘要】:
【中国标准分类号】:M73
【国际标准分类号】:31_200
【页数】:148P;A4
【正文语种】:英语


下载地址: 点击此处下载
【英文标准名称】:Datarequirementsforsemiconductordie.Particularrequirementsandrecommendationsfordietypes.Baredie
【原文标准名称】:半导体压模的数据要求.压模类型的特定要求和推荐标准.裸压模
【标准号】:PDES59008-5-1-2001
【标准状态】:现行
【国别】:英国
【发布日期】:2001-07-15
【实施或试行日期】:2001-07-15
【发布单位】:英国标准学会(BSI)
【起草单位】:BSI
【标准类型】:()
【标准水平】:()
【中文主题词】:拉丝模;数据处理;数据;情报处理;物料装卸;电子设备及元件;半导体;集成电路
【英文主题词】:informationhandling;integratedcircuits;materialshandling;semiconductors;wire-drawingdies;datahandling;data;electronicequipmentandcomponents
【摘要】:TobereadinconjunctionwithPDES59008-1,PDES59008-3,PDES59008-4:Parts1-4
【中国标准分类号】:L40
【国际标准分类号】:31_080_01
【页数】:14P;A4
【正文语种】:英语


Product Code:SAE J2816
Title:Guide for Reliability Analysis Using the Physics-of-Failure Process
Issuing Committee:Ground Vehicle Reliability Committee
Scope:The Physics-of-Failure (PoF) is a science-based approach to reliability that uses modeling and simulation to design-in reliability. This approach models the root causes of failures such as fatigue, fracture, wear, and corrosion. Computer-Aided Design (CAD) tools have been developed to address various loads, stresses, failure mechanisms and sites. PoF uses knowledge of basic failure processes to prevent failures through robust design and manufacturing practices, and aims to:?Design-in reliability up front;?Eliminate failures prior to testing;?Increase fielded reliability;?Promote rapid, cost effective deployment of Health and Usage Monitoring Systems (HUMS);?Improve diagnostic and prognostic techniques and processes; and,?Decrease operational and support costs.This guide provides a high level overview of the methodology, process and advantages to performing a PoF assessment.

版权声明:所有资料均为作者提供或网友推荐收集整理而来,仅供爱好者学习和研究使用,版权归原作者所有。
如本站内容有侵犯您的合法权益,请和我们取得联系,我们将立即改正或删除。
京ICP备14017250号-1